PASSE
A web application that guides new students in Grenoble facing financial hardship to health and food support, which I am leading as project manager of a team of seven.
In progressWeb applicationTeam of 72026
Context
SAÉ 3.01, a second-year BUT course project titled “Developing and deploying an application”, running from October 12, 2026 to January 22, 2027. Starting from a need described in a few lines, each team must gather and formalize the requirements, then build a secure client-server application backed by a database, with attention to usability, software quality and security. Fifteen teams of six or seven students work on it, each mentored by two teachers: ten weeks of two half-days a week, then three full-time weeks.
The shared brief: help future students discover university life in Grenoble through personalized services. The Université Grenoble Alpes welcomes about 57,000 students across some fifteen sites. After a creativity session, we presented our pitches to the mentors on October 23; the one selected targets new students facing financial hardship. Support exists, but it is scattered across the university, the CROUS student services, the family allowance office, the metropolitan area and local associations: many students find out about it too late, or never.
Our application is called PASSE, the French acronym for “Access Point to Student Support Services”. It is a guide: it informs students and points them to the official services, without replacing them.
Goals
- Bring together the health and food support available in Grenoble; other topics (financial aid, housing, transport, sport) link to the official site.
- Let anyone browse without an account: service pages, a map of places and a calendar of food distributions. An account, with a short needs questionnaire, personalizes the home page.
- Reach any service page in three clicks at most from the home page, on a phone first, without ever showing the word “hardship”, so that no one feels labeled.
- Let local associations manage their own page and publish their food distributions, once an administrator has approved their request.
- Provide reliable information: every page cites its source and the date it was last checked, and the demo will include at least thirty real ones.
- Comply with GDPR and security practice: only an email address is required, the need for psychological support is optional and asks for separate consent, passwords are hashed, the site runs over HTTPS and follows the OWASP Top 10.
Work
Phase 1: framing and requirements
Delivered on November 18, 2026 as a design report.
The framing draws on two recent national surveys, by the Cop1 association with Ifop and by the French Observatory of Student Life: one student in three has already skipped meals for lack of money, over half say they are poorly informed about psychological support, and fewer than three in ten students in distress have seen someone. We compared five existing solutions, from the UGA student portal to the government’s MesServices site: none combines filtering by profile, a map, health and food together, and publishing by local associations.
The scope of the final version is prioritized with the MoSCoW method. A register lists 21 constraints and risks, scored by impact and likelihood; once treated, none exceeds a criticality of 4 out of 9. A fallback strategy sets, for each use case, the reduced version to deliver if time runs short, rather than dropping it.
Four personas, from a 17-year-old who has just arrived in Grenoble alone to the president of a food aid association, lead to 14 user stories. The 27 functional requirements are grouped into 15 use cases for five actors (visitor, registered student, verified student, association, administrator): 14 Must, 7 Should and 6 Could. The ten non-functional requirements are measurable, each with its own verification method: a service found in under two minutes, a SUS usability score of at least 70, WCAG 2.2 level AA, a page displayed in under 2.5 s on 4G. Signing up, publishing a food distribution and an association claiming its page are modeled with a flowchart and two BPMN diagrams.
Architecture and technical choices
The team knows PHP, but none of us had used Symfony or Twig before. The chosen stack therefore stays close to what we know: Symfony 7 and Twig for server-rendered pages that stay light on a modest phone, PostgreSQL 16, Leaflet and OpenStreetMap for the map, EasyAdmin for the back office. Each developer will validate it with a proof of concept in sprint 3.
The application will run on two virtual machines at the IUT2. The application VM is the only one exposed to the Internet, over HTTPS; the data VM only accepts database connections from the first one, over TLS. Reviews and suggested content are checked by rules before publication, and a local AI may be added as an option, without any student’s text ever leaving the IUT’s servers. As the VMs have no mail server, decisions are shown in a notification center on the site.
Style guide
The style guide follows the Université Grenoble Alpes’ current identity, taken from its website rather than from the 2016 guidelines: orange and night blue, with the Calistoga and Open Sans typefaces. Designed for phones, it targets WCAG 2.2 level AA, checked against the RGAA, the French accessibility framework: a contrast matrix sets which colors each kind of text may use, and nothing overflows at a width of 320 px. Wireframes for the 27 screens, 24 for phones and 3 for desktop, are in progress on Figma.
Organization
The team has five students from the RA track (application development) and two from the DACS track (deployment and security). It follows Scrum in two-week sprints tracked on Jira, with Git for code and deliverables and Docker Compose for the same environment on every machine. Each session opens with a ten-minute stand-up (done, to do, blockers), and a task is only done once a peer has reviewed it and it is merged on Git. Each area has an owner and a backup, assigned by track and then checked against the Belbin test; a RACI matrix states who does, owns, is consulted on or informed of each work package.
As project manager, I estimated the team’s capacity: 28 guaranteed hours a week, 80% of them planned to absorb absences and the unexpected, or 22 guaranteed story points per sprint. Each sprint’s workload is checked against that capacity, and Should stories only make it into the last sprint if we are ahead.
Coming next
- Phase 2, due December 18, 2026, still devoted to design: the data model (conceptual, then logical) and a test dataset, mockups that follow the style guide, technical choices validated by proofs of concept, and environments ready for development: two hardened VMs, HTTPS, backups and continuous integration.
- Phase 3, due January 22, 2027: developing the Must features in January, starting with browsing service pages without an account, entering thirty real pages, security and user testing, then the final presentation and demo, after an oral presentation in English on January 15.
This page will be completed as the project progresses: screenshots of the application and a review.
My role
- Project manager: organizing the team of seven in Scrum sprints on Jira, running the rituals, tracking the schedule and liaising with the mentors.
- Project framing: scope prioritized with the MoSCoW method, a register of 21 constraints and risks scored by criticality, a fallback strategy.
- Sprint planning: the team’s capacity estimated in story points, and each sprint’s workload checked against it.
- The application’s style guide: a palette drawn from the university’s identity, typefaces and a contrast matrix.
Skills used
SAÉ 3.Real.01 · Developing an application
Develop applications
Level 2 · Go from requirements to a complete application
- AC21.01 Write and implement functional and non-functional specifications from requirements
- AC21.02 Apply accessibility and usability principles
Lead a project
Level 2 · Apply a project monitoring approach based on the business needs of clients and users
- AC25.02 Formalize the needs of the client and the user
- AC25.03 Identify the feasibility criteria of an IT project
- AC25.04 Define and apply a project monitoring approach
Work in an IT team
Level 2 · Understand one's role and duties within an IT team
- AC26.02 Apply an approach to join an IT team within an organization
- AC26.03 Use interpersonal skills to work in an IT team
- AC26.04 Report on one's professional activity
What I learned
- Framing a product from a pitch: problem, target users, priorities and risks.
- Scoring risks by impact and likelihood, and planning a fallback version for each use case.
- Designing an accessible style guide, with contrast checked against WCAG 2.2 and the RGAA.
- Running a team in sprints: short stand-ups, peer review and a definition of done.