Musigma

A Java desktop application for organizing a music festival, which I led as project manager of a team of six, then reworked and finished in 2026.

JavaJavaFXCalendarFXUMLSpotBugsPMD

CompletedDesktop applicationTeam of 62024

Context

An end-of-first-year project, run from April to June 2024. This “Mega SAÉ” combined four course projects: developing an application, exploring a problem through algorithms, running a project and organizing teamwork. It also drew on design, user interfaces, graph theory, mathematics, communication and English, for about 100 hours of work per student, six deliverables and three presentations.

The brief: design and build a desktop application that helps event organizers run their project. We chose music festivals and named the application Musigma.

Goals

  • Create a festival: dates, venue, area, rental price and stages.
  • Book artists and schedule their performances without overlaps.
  • Define ticket types, with their prices and perks.
  • Work out the stock needed from the perks of the tickets sold.
  • Simulate revenue and find the most profitable ticket sales.

Implementation

Phase 1: framing

The project charter (opens in a new tab) set out the functional requirements, as use cases ranked by priority, and the non-functional ones. We analyzed twelve risks in it, from disagreements within the team to a tool going down, each scored before and after mitigation, then ranked in a criticality matrix. Roles were assigned with the RACI method. The team talked on Discord, planned on Asana and shared the code on the university’s GitLab.

Phase 2: design

The design document (opens in a new tab) described each use case in detail, then the architecture in UML: class, sequence and object diagrams. The user interface document (opens in a new tab) went from personas to mockups, checked against usability criteria. In parallel, we modeled ticket sales as a linear program (opens in a new tab): in our example, selling 2,000 VIP and 3,000 standard tickets brings in at most €205,000, a result found graphically and then confirmed in R.

Phase 3: development

The application is written in Java with JavaFX, following MVC, and the schedule relies on the CalendarFX library. We first split the work by layer: two teammates on the data model, another one and I on the user interfaces. Each part kept waiting for the other, which caused delays, on top of a GitLab outage and libraries incompatible with our setup. Pair programming then gave us a shared view of the code. The project ended on June 21, 2024 with a demo, a pitch in English and the presentation of our Lean Canvas.

2026 rework

In October 2026, I reworked the application on my own to match our design document. The version handed in in 2024 did not actually run any of its tests, had no screen for artists, and its sales optimization gave a wrong result.

  • Reliability: the tests finally run, every bug found is first reproduced by a test, and SpotBugs and PMD analyze the code. The project has more than 80 tests.
  • Features: the priority use cases are complete. The festival has its stages and an end date, artists have their own screen, and the schedule refuses two concerts at the same time on the same stage. The forecast screen shows a full balance sheet, and the optimization finds the €205,000 of our model.
  • Usability: dark theme, zoom, contextual help, tooltips, keyboard shortcuts and a rewritten user guide. The distributable application, which did not start, now runs on Windows, Linux and macOS.

Results

Musigma now covers every priority use case of our design, from creating the festival to forecasting revenue. As project manager, I learned from our organizational mistake: splitting the work by complete module, with model, controller and interface together, would have kept everyone from waiting on the others. The rework taught me to work on code I had not entirely written, making it safe with tests before changing it.

My role

  • Project manager: split the work among the six members, tracked the deliverables, signed off on the design document, the math report and the application.
  • Project charter, with three teammates: requirements, risk analysis and roles.
  • Domain class diagram and an analysis of task scheduling with graph theory, each with a teammate.
  • User interfaces, with a teammate: main window and workspace menu, concert schedule, stock and ticket screens, validated input fields.
  • Took part in the persona, the logo, the Lean Canvas and the pitches in French and English.
  • In 2026, a solo rework of the whole application: code audit, fixes, use cases completed, tests and usability.

Skills used

SAÉ 2.01 · Developing an applicationSAÉ 2.02 · Algorithmic exploration of a problemSAÉ 2.05 · Managing a projectSAÉ 2.06 · Organizing team work

Develop applications

Level 1 · Develop simple software applications

  • AC11.01 Implement simple designs
  • AC11.02 Produce simple designs
  • AC11.03 Run tests and assess their results against the specification
  • AC11.04 Develop user interfaces

Optimize applications

Level 1 · Understand and build algorithms

  • AC12.01 Analyze a problem methodically (breaking it down into simple algorithmic steps, data structures…)
  • AC12.03 Formalize and apply mathematical tools for computing

Lead a project

Level 1 · Identify the business needs of clients and users

  • AC15.01 Understand the needs of the client and the user
  • AC15.02 Set up project management tools
  • AC15.03 Identify the stakeholders and phases of a development cycle

Work in an IT team

Level 1 · Identify one's own aptitudes for working in a team

  • AC16.03 Identify the status, function and role of each member of a multidisciplinary team
  • AC16.04 Acquire the interpersonal skills to work in a team

What I learned

  • Modeling software in UML before coding it: detailed use cases, class, sequence and object diagrams.
  • Building a desktop application in Java and JavaFX with an MVC architecture.
  • Framing a project: risks scored and ranked in a criticality matrix, roles assigned with the RACI method.
  • Splitting a team’s work to limit the dependencies between its members.
  • Turning a business problem into a linear program and solving it.
  • Taking over existing code: a test written before each fix, static analysis with SpotBugs and PMD.

100 %